Yesterday was the official first opening of Club 1/3 One Third in Beijing.

After 8 months of hard work and dedication, we could finally see the result and it was everything we’ve hoped for.

It was an epic night, and we are looking forward to tonight and tomorrow (2 more shows/openings to go!).

The big opening – Deadline

During the period before the opening, the creative team already programmed the general lighting, video looks and special made themed shows in their Amsterdam based studio based in a full 3D VR environment. It was because of this preparation that there was time on location to focus on the details and the performers. Also the video content, played out on screens that count more than fifteen thousand pixels in width, needed to be rendered and programmed in a touchscreen system so the local operating team could easily control the shows for daily operation.

We are very excited to be part of this adventure.